In below the pictures of ABL chartering operations which involved the shipment of 15 modules and accessories - 5384,363 cbm - 1679,02 ton
In Antwerp, ABL will proceed with the direct reloading of 12 modules + 15 crates (30cbm) into two barges, destination Budapest, where ABL will mobilize the crane and arrange for delivery during the night-time to a storage area at the site first. Afterwards, ABL will be in charge of delivering the modules from the storage area till the erection site.